Our work
Projects across Ghana
From rural borehole schemes to high-voltage transmission lines — a record of infrastructure delivered on time, to specification, and built to last.

31 projects
- Water Supply2012
Karaga Water Supply Scheme
Northern Region
Canadian International Development Agency (CIDA)
Feasibility studies, detailed design, construction supervision, and defects liability monitoring of a mechanised water supply scheme serving Karaga and surrounding communities, including a 215m³ hot-pressed elevated steel tank.
View case study - Water Supply2009
Tsiame Water Supply Scheme
Volta Region
Danish International Development Agency (DANIDA)
Design and construction supervision of a mechanised water supply system serving Tsiame and seven surrounding communities, including construction of a 100m³ elevated reinforced concrete reservoir and iron/ammonia removal plant.
View case study - Water Supply2010
Denkyira Obuase Water Supply Scheme
Central Region
Danish International Development Agency (DANIDA)
Design and construction supervision of a mechanised water supply scheme serving Denkyira Obuase and five surrounding communities, including multiple elevated reinforced concrete reservoirs.
View case study - Water Supply2008
Nkwanta Water Supply Scheme
Volta Region
Danish International Development Agency (DANIDA)
Construction supervision of a mechanised water supply scheme serving Nkwanta and surrounding communities in the Nkwanta South District, including a reinforced concrete reservoir and distribution network expansion.
View case study - Water Supply2007
Kpandai Water Supply Scheme
Northern Region
Danish International Development Agency (DANIDA)
Design and construction supervision of a mechanised water supply scheme in the Kpandai District, including borehole drilling, motorised pump installation, and construction of an elevated storage tank serving four communities.
View case study - Water Supply2006
Hohoe Water Supply System Rehabilitation
Volta Region
Danish International Development Agency (DANIDA)
Rehabilitation and expansion of the Hohoe water supply system including pump station refurbishment, pipeline replacement, and new service reservoir construction to improve coverage and water pressure across the district.
View case study - Water Supply2011
Bole Water Supply Scheme
Savannah Region
World Bank / IDA
Detailed design and construction supervision of a mechanised water supply scheme for Bole and five peri-urban communities, funded under the World Bank's community water and sanitation programme.
View case study - Water Supply2013
Gushiegu Water Supply Scheme
Northern Region
Canadian International Development Agency (CIDA)
Feasibility study, detailed design, and construction supervision of a new mechanised water supply scheme for Gushiegu and surrounding communities, delivering safe water to an estimated 12,000 beneficiaries.
View case study - Water Supply2005
AgSSIP Northern Ghana Water Infrastructure
Northern Region
World Bank (AgSSIP)
Construction of water supply infrastructure under the World Bank's Agricultural Services Sub-Sector Investment Project (AgSSIP), including multiple borehole installations, hand pump retrofits, and mechanised systems for agricultural communities.
View case study - Water Supply2014
Tolon Water Supply Scheme
Northern Region
Canadian International Development Agency (CIDA)
Design and construction supervision of a mechanised water supply scheme for Tolon and surrounding communities under CIDA's Northern Ghana Water Supply programme.
View case study - Water Supply2009
Dormaa Ahenkro Water Supply Scheme
Bono Region
World Bank / IDA
Construction supervision and quality assurance for a new water supply scheme in Dormaa Ahenkro, including construction of a gravity-fed distribution system and household connection programme.
View case study - Water Supply2010
Ejura-Sekyedumase Water Supply Rehabilitation
Ashanti Region
World Bank / IDA
Rehabilitation of ageing water supply infrastructure in the Ejura-Sekyedumase district including pump station upgrades, main replacements, and construction of a new storage reservoir.
View case study - Energy Infrastructure2004
Wexford Power Project
Northern Region
Private Sector
161kV Transmission Line. Full design and construction of a latticed steel tower powerline spanning 50km, including substation civil works, electromechanical layout, control, protection, and metering schematic diagrams. Delivered in collaboration with Power Consult.
View case study - Energy Infrastructure2016
Obotan Asanko Gold Mine — 161kV Substation
Ashanti Region
Private Sector
Design and construction supervision of the 161kV substation civil works for Asanko Gold Mine's Obotan mine site, including all structural, electromechanical, and protection system works.
View case study - Energy Infrastructure2008
VRA Substation Civil Works
Greater Accra Region
Volta River Authority (VRA)
Civil and structural works for a Volta River Authority substation upgrade, including foundation design and construction, cable trench works, and control building construction.
View case study - Energy Infrastructure2012
Mining Camp Electrical Infrastructure
Western Region
Private Sector
Design and installation of medium-voltage distribution and LV electrical systems for a mining camp facility, including generator room construction, MV switchgear installation, and site-wide LV distribution.
View case study - Roads & Buildings2006
Afram Plains Feeder Roads Rehabilitation
Eastern Region
World Bank (AgSSIP)
Rehabilitation of feeder roads in the Afram Plains area under the World Bank's AgSSIP programme, improving rural access for agricultural communities and reducing post-harvest losses through better market connectivity.
View case study - Roads & Buildings2005
Northern Region Feeder Roads Improvement
Northern Region
World Bank (AgSSIP)
Improvement and rehabilitation of 38km of feeder roads in the Northern Region under the AgSSIP programme, linking farming communities to district markets and improving year-round accessibility.
View case study - Roads & Buildings2011
District Health Facility Construction
Northern Region
World Bank / IDA
Construction of a community health compound including a CHPS facility, staff accommodation, and associated infrastructure — part of a wider World Bank-funded primary healthcare programme in Northern Ghana.
View case study - Roads & Buildings2007
Dome Office & Operations Complex
Greater Accra Region
Private Sector
Design and construction of Hydrocom Limited's own headquarters facility at Dome, Accra, including office block, workshop, equipment yard, and ancillary structures.
View case study - Roads & Buildings2008
Three-Unit Classroom Block Construction
Volta Region
Danish International Development Agency (DANIDA)
Construction of a three-unit classroom block, ancillary facilities, and VIP latrine for a community school in the Volta Region, forming part of a DANIDA education infrastructure package.
View case study - Roads & Buildings
7-Storey Hostel — Sokode Lokoe, Ho
Volta Region
Private Sector
Design and construction of a seven-storey hostel building at Sokode Lokoe, Ho, in the Volta Region — a multi-storey reinforced concrete structure with associated services and finishes.
View case study - Roads & Buildings
Koforidua–Suhum Road Resealing
Eastern Region
Government of Ghana
Resealing and rehabilitation of the Koforidua–Suhum road in the Eastern Region, restoring the carriageway surface and improving drainage and road safety along the corridor.
View case study - Roads & Buildings
Akwansiho–Banka & Akwansiho–Tweneduase Feeder Roads
Eastern Region
Government of Ghana
Construction and improvement of the Akwansiho–Banka and Akwansiho–Tweneduase feeder roads, improving all-weather access for farming communities in the area.
View case study - Environmental Sanitation2005
Budumburam Refugee Camp — Water & Sanitation Assessment
Greater Accra Region
UNHCR
Assessment of water, health, and sanitation-related issues in the Budumburam refugee camp, with recommendations for infrastructure improvement and humanitarian response planning.
View case study - Environmental Sanitation2013
Northern Ghana Rural Sanitation Programme
Northern Region
Canadian International Development Agency (CIDA)
Construction of household and institutional sanitation facilities across 18 communities in Northern Ghana, including VIP latrines, institutional sanitation blocks, and solid waste collection infrastructure.
View case study - Environmental Sanitation2009
Volta Region WASH Programme — Sanitation Component
Volta Region
Danish International Development Agency (DANIDA)
Sanitation component of a DANIDA-funded WASH programme in the Volta Region, delivering latrine construction, hygiene promotion infrastructure, and institutional sanitation upgrades across 12 communities.
View case study - Environmental Sanitation2007
UNDP Community Infrastructure & Sanitation Project
Upper East Region
United Nations Development Programme (UNDP)
Delivery of community infrastructure and sanitation works under UNDP's Ghana country programme, including construction of public toilet facilities, drainage improvements, and community water points.
View case study - Environmental Sanitation
3SWASH Project — Feasibility Studies, Bongo
Upper East Region
WaterAid
Conduct of feasibility studies in six communities in Bongo under the 3SWASH Project, a project funded by WaterAid, a British NGO, to inform sustainable water, sanitation, and hygiene delivery.
View case study - Other Services2006
Infrastructure Condition Assessments — Refugee Settlements
Multiple Regions
UNHCR
Structural and infrastructure condition assessments of multiple refugee and IDP settlement facilities in Ghana, providing UNHCR with engineering data for maintenance planning and capital investment decisions.
View case study - Other Services2004
AgSSIP Irrigation & Agricultural Infrastructure
Eastern Region
World Bank (AgSSIP)
Construction of small-scale irrigation infrastructure and agricultural support facilities under the World Bank's AgSSIP programme, improving dry-season farming capacity for smallholder communities.
View case study
Have a project in mind?
From feasibility to commissioning — let's deliver your next piece of infrastructure on time and to specification.