Project overview
Design and installation of medium-voltage distribution and LV electrical systems for a mining camp facility, including generator room construction, MV switchgear installation, and site-wide LV distribution.
Scope of work
- 11kV ring main unit and transformer installation
- LV distribution board design and installation
- Camp-wide cable laying and termination
- Generator room civil works and ventilation
